6th & Woodland Building

Building Highlights

  • Highest quality building in Lacey and one of the highest quality buildings in Thurston County
  • Convenient location with easy access to I-5
  • Ideally suited for doing business within Thurston, Pierce and/or South King County
  • Easy access to Joint Base Lewis-McChord
  • High Visibility with signage opportunity on four-story building
  • True Class "A" New Construction completed in 2008
  • 174 Parking Spaces Including Underground Garage
  • Flexible floor plans can accommodate full floor tenants to 15,320 rsf and tenants as small as 1,400 rsf 
  • Elegant Lobbies & Common Spaces will impress employees and visitors
  • High Speed Elevators
  • Multiple Decks on Each Floor
  • State-of-the-Art Amenities
  • Generous Tenant Improvement Allowance
  • Ideal for Professional, Medical, or Government tenants

Availability

Suite #

100

102

200

201

301

320

340

400

Total

 Size (rsf)

6,088

 8,010

 6,159

 8,886

 2,844

 1,958

 3,500

15,800

59,990

Status

Leased

Leased

Leased

Available

Leased

Leased

Available

Available

Building Features

  • Building Size: 59,990 rentable square feet (rsf)
  • Frontage: 6th Avenue S.E. and parking lot access from Woodland Square Loop
  • Year Built: 2008
  • Parking: 174 parking spaces located in Garage and on Surface lots
  • Number of Stories: 4
  • Building Structure: The building is constructed with a reinforced concrete frame. The exterior walls are a mix of brick, dryvit panels and tinted spandrel glass panels in aluminum frames
  • Roof: Flat with parapet and a multiple-ply cover on concrete deck
  • HVAC: Zoned air conditioning is provided via a variable air volume system which provides conditioned air to the tenant spaces. Mechanical equipment (gas-fired Trane) is located on the roof of the building.
  • Fire and life safety: The entire building is serviced by the fire sprinkler systems quick-response heads
  • Power: The building is supplied by a 480/277 volt 200 amp three phase service. There are two sub meters per floor at the main distribution panel (MDP) which provides two 200 amp services to each floor.
  • Internet: High speed Fiber available through Century Link, Comcast(Xfinity), and Integra.  Building has CAT 5 cabling throughout.
  • Elevators: Two elevators serve all four office floors and the parking garage
  • Generator: 60Hz Kohler Diesel Generator, certified by the EPA to conform to Tier 3 non-road emissions standards
  • Clock Tower: Really Big Clock Tower in case you forget to wear your watch!