6th & Woodland Building

Building Highlights

  • Highest quality building in Lacey and one of the highest quality buildings in Thurston County
  • Convenient location with easy access to I-5
  • Ideally suited for doing business within Thurston, Pierce and/or South King County
  • Easy access to Joint Base Lewis-McChord
  • High Visibility with signage opportunity on four-story building
  • True Class "A" New Construction completed in 2008
  • 174 Parking Spaces Including Underground Garage
  • Flexible floor plans can accommodate full floor tenants to 15,320 rsf and tenants as small as 1,400 rsf 
  • Elegant Lobbies & Common Spaces will impress employees and visitors
  • High Speed Elevators
  • Multiple Decks on Each Floor
  • State-of-the-Art Amenities
  • Generous Tenant Improvement Allowance
  • Ideal for Professional, Medical, or Government tenants

Availability

Square feet shown is rentable square feet (rsf)

Building Features

  • Building Size: 59,990 rentable square feet (rsf)
  • Frontage: 6th Avenue S.E. and parking lot access from Woodland Square Loop
  • Year Built: 2008
  • Parking: 174 parking spaces located in Garage and on Surface lots
  • Number of Stories: 4
  • Building Structure: The building is constructed with a reinforced concrete frame. The exterior walls are a mix of brick, dryvit panels and tinted spandrel glass panels in aluminum frames
  • Roof: Flat with parapet and a multiple-ply cover on concrete deck
  • HVAC: Zoned air conditioning is provided via a variable air volume system which provides conditioned air to the tenant spaces. Mechanical equipment (gas-fired Trane) is located on the roof of the building.
  • Fire and life safety: The entire building is serviced by the fire sprinkler systems quick-response heads
  • Power: The building is supplied by a 480/277 volt 200 amp three phase service. There are two sub meters per floor at the main distribution panel (MDP) which provides two 200 amp services to each floor.
  • Internet: High speed Fiber available through Century Link, Comcast(Xfinity), and Integra.  Building has CAT 5 cabling throughout.
  • Elevators: Two elevators serve all four office floors and the parking garage
  • Generator: 60Hz Kohler Diesel Generator, certified by the EPA to conform to Tier 3 non-road emissions standards
  • Clock Tower: Really Big Clock Tower in case you forget to wear your watch!

Siteplan