673 Building

Download 673 Building Brochure

Open a Virtual Tour Window

Building Highlights

  • Highest quality building in Lacey and one of the highest quality buildings in Thurston County

  • Convenient location with easy access to I-5

  • Ideally suited for doing business within Thurston, Pierce and/or South King County

  • Easy access to Joint Base Lewis-McChord

  • High Visibility with signage opportunity on four-story building

  • True Class "A" New Construction completed in 2008

  • 174 Parking Spaces Including Underground Garage

  • Flexible floor plans can accommodate full floor tenants to 15,320 rsf and tenants as small as 1,400 rsf

  • Elegant Lobbies & Common Spaces will impress employees and visitors

  • High Speed Elevators

  • Multiple Decks on Each Floor

  • State-of-the-Art Amenities

  • Generous Tenant Improvement Allowance

  • Ideal for Professional, Medical, or Government tenants

Tenants

  • Medcom

  • Penser

  • Sorenson

  • Access the USA

  • TEP Management

  • Littlefield, Fanning, and Co.

Location Map

 

Building Features

  • Building Size: 59,990 rentable square feet (rsf)

  • Address: 673 Woodland Square Loop SE, Lacey

  • Frontage: 6th Avenue S.E. and parking lot access from Woodland Square Loop

  • Year Built: 2008

  • Parking: 174 parking spaces located in Garage and on Surface lots

  • Number of Stories: 4

  • Building Structure: The building is constructed with a reinforced concrete frame. The exterior walls are a mix of brick, dryvit panels and tinted spandrel glass panels in aluminum frames

  • Roof: Flat with parapet and a multiple-ply cover on concrete deck

  • HVAC: Zoned air conditioning is provided via a variable air volume system which provides conditioned air to the tenant spaces. Mechanical equipment (gas-fired Trane) is located on the roof of the building.

  • Fire and life safety: The entire building is serviced by the fire sprinkler systems quick-response heads

  • Power: The building is supplied by a 480/277 volt 200 amp three phase service. There are two sub meters per floor at the main distribution panel (MDP) which provides two 200 amp services to each floor.

  • Internet: High speed Fiber available through Century Link, Comcast(Xfinity), and Integra. Building has CAT 5 cabling throughout.

  • Elevators: Two elevators serve all four office floors and the parking garage

  • Generator: 60Hz Kohler Diesel Generator, certified by the EPA to conform to Tier 3 non-road emissions standards

  • Clock Tower: Really Big Clock Tower in case you forget to wear your watch!